Mould Drawing Check
Before sending out the mould design to customer,
our engineer will check the mould design according
to the specification from customer. After finalizing
every detail, the engineer will fill in the Mold
Drawing Checking Form and send together with the
mould design to customer for final examination.
Time Schedule
Once getting approval of customer, a time schedule
will be sent to customer for following up. We
have personnel to check the every step of the
machining. And avoid any mistake occurred in the
machining process and this will help us to catch
the time schedule.
Weekly Report
In order to keep the customer to get the latest
status of the project, weekly report will be sent
to customer by the person who is responsible for
the project.
T1 Sample Check with Projection Equipment
We will check the structure and dimension of
T1 sample by using Projection Equipment to ensure
they meet the requirement of customer. The related
data will be filled in T1 Sample Check Report.
This report will be sent to customer while we
send out the T1 sample by DHL.
Mould Trial Production before shipment
In order to ensure the quality of mould, we
will run a 3-4 hours trial production before shipment.
And we will take a movie clip and send to customer
for reference.
Export Mould Packing Inspection
Before releasing the mould, we will make a packing
inspection to ensure all the components , accessories
and documents have been enclosed.
Documents enclosed:
Mould Inspection Check for Shipping
Steel Certification
Latest Injection Test Report
Drawing for Components of Mould
Final Mold Layout
Share Components List
Feedback Form of Mould Quality
|